November 18, 2026 USD 45.20EUR 49.57PLN 11.24
Новини Бар — коротко й по суті
LIVE
The Bridge Battle: How Infrastructure Confrontation Affects City Security Energy situation: Scheduled power outages introduced in Ukraine for November 19 Council of Europe Approves 2027–2030 Action Plan for Ukraine Unmanned Trucks in China: Innovations for Extreme Conditions Allegations of Political Pressure: SBU General Duka Addresses Parliamentary Commission European Commission calls for accountability over Russia's use of chemical weapons in Ukraine Drone strikes reported on apartment building and post office in Chuhuiv Preparing roses for winter: tips for gardeners in Bar Ukraine’s MoD: Kerch Bridge no longer functions as a transport artery Massive Shelling in Dnipropetrovsk Region: Six Injured The Bridge Battle: How Infrastructure Confrontation Affects City Security Energy situation: Scheduled power outages introduced in Ukraine for November 19 Council of Europe Approves 2027–2030 Action Plan for Ukraine Unmanned Trucks in China: Innovations for Extreme Conditions Allegations of Political Pressure: SBU General Duka Addresses Parliamentary Commission European Commission calls for accountability over Russia's use of chemical weapons in Ukraine Drone strikes reported on apartment building and post office in Chuhuiv Preparing roses for winter: tips for gardeners in Bar Ukraine’s MoD: Kerch Bridge no longer functions as a transport artery Massive Shelling in Dnipropetrovsk Region: Six Injured

Heating supply partially suspended in three Kyiv districts due to pipeline damage

🏙️ City 1 min read 👁 2

Kyiv utility services are repairing a damaged heating pipeline on Velyka Vasylkivska Street. Heating has been temporarily suspended for consumers in the Holosiivskyi, Pecherskyi, and Shevchenkivskyi districts.

Heating supply partially suspended in three Kyiv districts due to pipeline damage🏙️City

Photo: Ukrinform

Key points

  • Heating pipeline damage in Kyiv
  • Emergency repairs in three districts
  • Restoration expected by November 19

A technical failure in the capital's heating network has led to a temporary suspension of heat supply for residents in several central districts. Kyivteploenergo specialists are currently working on-site at Velyka Vasylkivska Street to address the damage.

Repair progress

The disruption affects parts of the Holosiivskyi, Pecherskyi, and Shevchenkivskyi districts. Streets experiencing outages include Antonovycha, Baseina, Khreshchatyk, Saksahanskoho, Shota Rustaveli, and others. The city administration has confirmed that repair crews are working around the clock to resolve the issue.

Preliminary reports indicate that the damaged section is scheduled for replacement overnight. Full restoration of heating circulation is expected by 2:00 PM on November 19.

Source Ukrinform — ukrinform.net/rubric-society/4186129-heating-partially-disrupted-in… ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.